Manufacturing massive log houses

Accurately selected,  technologically correctly dried and precisely treated wooden material is a key to good massive log house quality.

Our professional work and equipment guarantees the best result for whatever you choose, glued beam house or massive beam house. We offer multiple standard house elements for your choice. Massive or glued beam frame, with or without insulation.
Our specialists will do a precise production of your massive log house elements, with beam profile and key mills (managed automatically), according to designs.
The control assembly in factory allows to exclude inaccuracies before delivering the frame to construction site and assembling it. Technical drillings for installing electrical cables, are made after a precise designs, during the process of production.
The production of massive log houses can take from 20 to 30 days depending on complexity of the house and size. Right after production house is ready to be delivered to construction site.

Comments are closed